Milton Fire New Headquarters - 2022-2024, GC: G&R Construction. New 5 equipment bay two story fire station in Milton, MA. New electrical service, distribution, branch power, lighting, fire alarm, data communications. Renovation of existing HQ building.
Milton Fire New Headquarters - 2022-2024, GC: G&R Construction. New 5 equipment bay two story fire station in Milton, MA. New electrical service, distribution, branch power, lighting, fire alarm, data communications. Renovation of existing HQ building.
Rendering - New Fire HQ
September 2022 - Underground for site lighting
September 2022 - Underground old HQ to future HQ
September 2022 - Underground for old HQ to Town Hall for communications
September 2022 - Foundation penetrations old HQ
September 2022 - Losordo crew working on pipes leaving Town Hall
February 2023 - Steel is up!
February 2023 - Interior
February 2023 - Underslab rough conduit
May 2023 - Slabs poured, interior framing underway
May 2023 - Rough electrical underway
May 2023 - Exterior sheathing underway
July 3, 2023 - Exterior brick underway
July 3, 2023 - Interior
July 3, 2023 - Masons working inside
July 3, 2023 - Electrical overhead conduit
July 3, 2023 - Fire alarm and power whips
July 3, 2023 - Crew pulling MC cable
July 3, 2023 - Life safety ATS and emergency lighting tub
July 3, 2023 - Main electric room well underway
July 3, 2023 - Standby ATS installed
July 3, 2023 - "Breaker, breaker..."
July 3, 2023 - Main switch
July 3, 2023 - Lotsa MC coiled high
July 3, 2023 - Lifts, ladders
July 3, 2023 - Rough electrical in wall
July 3, 2023 - Stylin' pipe rack
July 3, 2023 - Ceiling rough & wall board already going on!
July 3, 2023 - View of the apparatus bay
July 3, 2023 - Health/Welfare mezzanine
August 29, 2023 - Glass is up!
August 29, 2023 - Massive FOLDING garage doors
August 29, 2023 - Finish walls and glass
August 29, 2023 - Electric room getting completed
August 29, 2023 - Main switchboard and some panels are done
August 29, 2023 - Ceilings in kitchen/day area going in
August 29, 2023 - Chris working on fire alarm
August 29, 2023 - Devon devicing
August 29, 2023 - Geoff reviewing 2nd floor
August 29, 2023 - O'Brien's roughed to IDF
August 29, 2023 - Devon wiring devices
August 29, 2023 -John and Tom on lift in apparatus bay
August 29, 2023 - Looks messy but progressing
August 29, 2023 - Old kitchen and electric room are gone!
August 29, 2023 - Generator is landed on the pad!
August 29, 2023 - Not my trade but wow, those are cool doors
August 29, 2023 - Exterior is progressing
10/31/2023 - Finishes going in
Electrician Chris wiring up canopy lights off a lift.
10/31/2023 - Chris wiring canopy lights
10/31/2023 - Apparatus bay
10/31/2023 - Finishes going in everywhere
10/31/2023 - Life safety finish nearing completion
10/31/2023 - Apparatus bay (from mezzanine)
10/31/2023 - Almost complete
10/31/2023 - Bunk lights with red alert feature
10/31/2023 - Dining and kitchen ceiling complete
10/31/2023 - Low voltage cabling complete
10/31/2023 - Cables terminated
10/31/2023 - Kind of a busy IDF closet!
Lots of conduits for fire department roof top antennas etc.
10/31/2023 -Another apparatus bay view
10/31/2023 - Lighting is pretty much wrapped up
10/31/2023 - Apparatus bay door controllers
10/31/2023 - Electric cord reels are up
Losordo Electric - 2023