Portfolio
Selected projects 2004-2024
2022-2023 Piers Park II Sailing Center / Owner: Massport / GC: McCourt Contruction
New sailing center and pavilion in new public park in East Boston
2022-2023 Brighton High School Locker Room Renovations / Owner: Boston Public Schools / GC: Northern Construction
2023-2024 Madison Park / Mandela Athletic Complex Locker Room Renovation / Owner: Boston Public Schools / GC: Northern Construction
2022-2024 Memorial Swimming Pool Improvements / Owner: Town of Weston / GC: Construction Dynamics
2023-2024 Pecunit WTF GAC Treatment Addition / Owner: Town of Canton / GC: D&C Construction Company
2020-2023 Lenox Apartments, Owner: Beacon Communities, GC: D.F. Pray
Upgrades to 13 low rise buildings, approximately 245 housing units and 1 community center and management office.
2020-2021 City of Boston Engagement Center / GC: J and J Contractors
A new 6000 square foot daytime engagement center for Boston Public Health Commissions addiction and homeless clients, LEED, 18kv rooftop photovoltaic array.
2017-2021 Chelsea Creek Headworks Upgrade. Owner: MWRA / GC: Barletta
Multiyear project to rebuild and refurbish Chelsea Creek Headworks in place and maintaining operations throughout. Complete replacement of power, including new incoming 13.8KV utility transformer, new 1MW generator, new MCC, all new SCADA wiring. Extensive explosioin proof installations and custom control stations to underground water channels, augers and pumps.
2018-2021 Deer Island Waster Water Treatment Plant. Owner: MWRA / GC: Walsh Construction Corp.
Rebuild of the six gravity thickeners at the MWRA Deer Island Wastewater Treatement Plant in Winthrop, MA. Multiyear, multiple phase project requiring stainless steel and explosion proof electrical systems. New electrical work within the existing functioning plant.
2020-2021 Hanscom AFB Express Market and Gas Station Owner: Air Force Express / GC: IFCC
Renovation of existing market and gas station.
2021-2022 Security Cameras at Franklin Field, South Street and Fairmount Developments, Owner: Boston Housing Authority / GC: New Era Technologies - Exterior camera upgrades at three public housing developments
2019 Dave and Busters, Natick Mall. Owner: Dave and Busters / GC: ResCon Group (Florida)
New restaurant, bar and arcade inside Natick Mall, MA. 45000 square feet, all new lighting and distribution systems. Completed June 2019.
2018 New Central Fire Station. Owner: Walpole MA / GC: G&R Constructors
New construction of fire station with 10 bays, offices, common areas, and bunk rooms, with temporary structure. Electrical service, fire alarm, lighting, network lighting controls, power, emergency generator.
2016 New Belmont Municipal Light Plant. Owner: Belmont MLP / GC: Boston Building & Bridge
Construction of new municipal light plant, 480V and below distribution systems, extensive underground and precast trench support for high voltage pathways .
2015 Fenway High School Additions and Renovations. Owner: City of Boston PFD / GC: O’Connor Constructors
Renovation of four story school and new cafetorium addition, new fire alarm, lighting (700 items), data communications (850 drops), BDA, mechanical systems, branch power, access control, intrusion, detection, cameras and NVR, public address systems, clocks, and limited distribution upgrades
2015 Cary Memorial Hall Renovations. Owner: Town of Lexington / GC: Nauset
Renovation of a historic auditorium. New electrical service, mechanical systems, renovation of historic lighting, theatrical lighting and dimming systems, support for large scale AV systems. Extensive coordination to recess all conduits and systems to return facility to historic look.
2015 Reconstruction of the State Police Barracks (Weston). Owner: DCAMM / GC: Seaver
Construction of new state police barracks, new electrical service, distribution, generator, security, fire alarm, lighting, mechanical systems, branch power, data communications
2014 University Crossing Campus Center, UMASS Lowell. Owner: DCAMM/UMASS / GC: Shawmut
Complete electrical distribution, branch, lighting, lighting controls, and system fire alarm for new 150,000 sq ft Campus Center. Multi-story structure, 800KW roof top generator, network nLIGHT lighting controls, networked fire alarm, smoke control systems, 2000A main service.
2014 Norfolk County Agricultural School. Owner: Norfolk County Commissioners / GC: Brait Brothers
Multiyear, multiphase construction and renovation at Norfolk County Agricultural High School, construction of two new classroom and mechanical education buildings, horse barn and interior riding facility, complete renovation of two existing buildings, partial renovation to existing office building. New campus power distribution, backbone fiber and copper communications, distribution at five buildings, emergency generator, branch power, data cabling, lighting, lighting control, fire alarm, intrusion, access control, IP cameras, IP & copper based public address, wireless master clock. Campus wide fire alarm, bi-directional antenna system, security, cameras. Accelerated delivery after first GC was terminated.
2012-2014 Norfolk County Agricultural New Addition and Renovation, multiyear multiple phase new building construction and renovations of mechanical shops, classrooms, labs, and administrative space . New electrical services, emergency generators, power distribution, lighting, fire alarm, public address, clock systems, security, data communications.
2014 Reggie Lewis Track Audio-visual Upgrades. Owner: Roxbury Community College. GC: Losordo Electric
Supply of large scale LED video board in track facility, conduit and power systems to support future camera and A/V installations track and gym facilities, added three 48 PORT PoE CAT6 switches and cabling infrastructure, added single mode fiber installations for video board and 10Gb Ethernet backbone links.
2013 East Somerville Community School. Owner: Somervill, MA / GC: Gilbane
Two story building , 147,000 sq ft usable space. Complete rehab of existing school that had partially burned, new service, new 2000A distribution systems, new 350KW emergency diesel generator, new branch and lighting, mechanical, auditorium lighting and dimming, aisle lighting, fire alarm, access control, intrusion detection, camera systems, data communications inside wiring. T.
2012 Natick Community Senior Center. Owner: Town of Natick / GC: TLT
New construction of a 50,000 sq ft, 2 story senior and community center. New 1200A electrical distribution, building lightning protection, central fire alarm, telecommunications cabling, three local sound systems, assistive listening, gymnasium with scoreboards, automated lighting controls, exterior diesel generator and transfer switches, site lighting & bollards, emergency call system, kitchen equipment and emergency shutoff
2011 Shelburne Community Center Renovations. Owner: Boston PFD / GC: Colantonio
Comprehensive modernization of all electrical systems at a community center for City of Boston. New 800A main service, new lifesafety generator, new distribution panels, new addressable fire alarm system, new lighting and branch devices, new lighting control system, new DVR & camera systems.
2010 Renovations to the Senator William X. Wall Experiment Station (Lawrence, MA). Owner: DCAMM / GC: O’Connor Constructors
New four story laboratory addition to state facility, new electrical distribution systems, new emergency generator, data, lighting, fire alarm, lighting control systems and branch electrical
2009 Wellesley Municipal Utilities Site and Building Improvements. Owner: Town of Wellesley MA / GC: PJ Stella
Construction of garage and office addition to existing DPW facility upgraded under prior contract (2007) and construction of a new garage and office facility for the Municipal Light Plant on same site. New distribution, branch, lighting, fire alarm, security systems. Lightning protection systems.
2009 Health and Wellness Center at Bunker Hill Community College. Owner: DCAMM/BHCC / GC: Daniel O’Connell & Sons
Electrical, Fire Alarm, Telecommunications. New wing at Bunker Hill Community College, new electrical, fire alarm, gymnasium sound system, data, emergency generator, lighting, and branch devices. MWBE subcontractor requirements. Tie in to networked fire alarm system.
2008 City on a Hill Charter School Phase 1 & 2. Owner: City on a Hill / GC: CTA Construction
Electrical work supporting a new addition to charter school in Boston, MA. New lighting, fire alarm, branch power and extension of the electrical distribution systems from main building renovated in Phase 1. Phase 1 renovation complete electrical system upgrades (distribution, fire alarm, branch circuit, lighting, generator) during renovation of existing building to create a new charter school.
2006 Renovations to Boston Fire Stations 9,18,24 & 30
Owner: Boston PFD / GC: G.V.W
2005 Lemuel Shattuck Hospital Fire Alarm Panel Upgrade. Owner: DCAMM / GC: Losordo Electric.